Name of Employer: Leighton-Chun Wo Joint Venture

Date Started: January 2019

Date Completed: December 2021

System:

  • Plumbing and Drainage System
  • Mechanical, Ventilation and Air-conditioning System
  • Electrical and power system
  • Fire Service System
  • Gas System

Type of Work Performed:

P&D Services:

  • Supply, Installation and T&C for the whole plumbing and drainage system including P&D major equipment, field equipment, accessories, pipework and sanitaryware.
    • Potable water service
    • Flushing water service
    • Irrigation water service
    • Storm water service
    • Soil, waste and vent service
    • Electrical control for hydraulic service
    • Sanitaryware installation

MVAC Service:

  • Supply, Installation and T&C for the whole MVAC system including major equipment, field equipment, accessories, pipework, ductwork and FRP enclosure.
    • Ventilation service
    • Chilled water service
    • Air-conditioning service
    • Condensation water service
    • Electrical control for MVAC service

Electrical Service:

  • Supply and fix embedded conduits in North Annex Building
  • Supply and fix trunking and cables for diversion work in Terminal 1 Depot
  • Supply and Installation of cable containment for ELV System in Old Depot and Skypier Platform
  • Supply and fix cable Containment for Relocation of CCTVs

Fire Service:

  • Provision of site inspection and issuance of FS251 for fire hydrants at South Annex Building
  • Provision of site inspection and issuance of FS251 for MVAC systems, emergency lightings and Exit Signs in South Annex Building
  • Provision of site inspection and issuance of FS251 for SES works in AEL at MTR L6 Platform of Terminal 2
  • Provision of site inspection and issuance of FS251 for Access Control System in South Annex building

Gas Service:

  • Decommission the existing gas risers and all internal pipework to facilitate the demolition work in Terminal 2