HKAA Contract C3603 – 2.7 km High-Speed Integrated Conveyor BHS tunnel in between T2 and T2C (T2-T2C Tunnel)

02
Jun
Baggage Handling System
Logistic and lifting work for all mechanical services and electrical equipment
Mechanical installation for four lines of conveying belting in 2.7km with two layers for each completed with fencings and all necessary accessories.