HKAA Contract T21W016 – Modernisation of Air-conditioning System at Terminal 1
Name of Employer: CLPe Solutions
Date Started: June 2022
Date Completed: June 2027
System:
Chilled Water System
Mechanical Ventilation System
Electrical and Control System
Type of Work Performed:
Upgrading the existing AHUs in Terminal 1
- Replacement of new split / single cooling coils
- Replacement of traditional belt drive fans with new integrated electronic commutated (EC) fans (retrofit of fan section / fan wall approach), performing optimization, completed with all associated power & signal wiring connection
- Installation, testing and commissioning of new integrated direct digital controllers (DDCs)
- Delivery, installation, testing and commissioning of pressure independent control valves (PICVs) and associated flowmeter, modulating control valve, temperature sensors