Name of Employer: Wanson Construction

Date Started: December 2023

Date Completed: November 2024

System:

  • Plumbing and Drainage System
  • Mechanical, Ventilation and Air-conditioning System
  • MBMS System

Type of Work Performed:

P&D Services:

  • Carry the hydraulic work supply and installation with all necessary testing and commissioning for three toilets revamp in skypier.
    • Potable water service
    • Flushing water service
    • Soil, waste and vent service
    • Electrical control for hydraulic service
    • Sanitaryware installation
    • WSD submissions and water sampling

MVAC Service:

  • Supply, Installation and T&C for the new air purifiers and associated power and control panels and wiring work for three toilets. Modification of existing branch airducts with grille to suit the new toilet layout in Skypier.
  • Supply, Installation and T&C for the new Fan Coil Units (FCU) in seating lounge in Skypier completed with new chilled water pipe tee-off from existing system by pipe freezing.
  • Modification of existing fire and smoke dampers and all necessary statutary submissions.
    • Ventilation service
    • Chilled water service
    • Air-conditioning service
    • Condensation water service
    • Electrical control for MVAC service

MBMS Service:

  • Supply, Installation and T&C for the new DDC panels
  • Carry work MBMS interfacing with modified MVAC system.