Portfolio

HYD Contract HY/2014/05 – Hong Kong-Zhuhai-Macao Bridge, Remaining Building and Ancillary Facilities (RBAF)

Name of Employer: Leighton-Chun Wo Joint Venture

Date Started: September 2016

Date Completed: January 2018

System:

Plumbing and Drainage System

Type of Work Performed:

Supply, install and T&C the whole plumbing and drainage system listed as belows for 14 nos ancillary buildings:

  • Potable water service
  • Flushing water service
  • Irrigation water service
  • Hot water service
  • Storm water service
  • Soil, waste and vent service
  • Sanitaryware Installation