HYD合约 HY/2014/05 -港珠澳大桥余下辅助建筑物及设施
Name of Employer: 礼顿 - 俊和联营
Date Started: 9 月 2016
Date Completed: 1 月 2018
System:
Type of Work Performed:
Supply, install and T&C the whole plumbing and drainage system listed as belows for 14 nos ancillary buildings:
- Potable water service
- Flushing water service
- Irrigation water service
- Hot water service
- Storm water service
- Soil, waste and vent service
- Sanitaryware Installation